We made quite a bit of headway over spring break! We were able to attach and cover the castle in the rear of the float and we also framed up the mystery machine. This week we're planning to start working on the skirt on the rear of the chassis, building the draw bridge on the castle, setting the towers on the castle, bricking and painting the castle, and setting and sheeting the mystery machine.
We've got a busy week planned and we'll need to keep at it because the parade is less than a month away!
Inside the castle looking out of the drawbridge doorway at the Mystery Machine
The framed Mystery Machine, we'll be mounting it to the chassis soon.
No comments:
Post a Comment